Pre-Construction Planning

Preparation is where risk is removed before work begins.

​​

​

Planning Permission Compliance

Confirmation of planning approval conditions and discharge of conditions where required.

​

Building Regulations Strategy

Coordination with Approved Inspectors or Local Authority Building Control.

​

CDM Regulations 2015

Appointment of Principal Designer and Principal Contractor with formal construction phase planning.

​

Design Coordination

Integration of architectural, structural, and engineering drawings.

​

Technical Specifications

Detailed schedules, materials specifications, and performance requirements.

​

Programme Development

Project timeline, sequencing, and milestone structure.

020 3336 2525
Unit 10 Pride House
Shanklin Road  N15 4FB
Registered in England & Wales
Company Number: 15164775
© 2026 Kohn Capital. All rights reserved. Designed by Kohn Capital Branding.
LLAS red 1815.png
landlord-tenancy-deposit-schemes.png
EFGHIJKLM.png
Contact Us
bottom of page